Complete Project

1- Guardian structure project of babojavad station(Mashhad subway line3).
2- Guardian structure project of T3 station(Mashhad subway line3).
3- Construction of coastal villas and commercial center around Izadshahr, Mazandaran province with an area of 12,000 square meters.
4- Introduction of 96-bed-Amol hospital with 17000 m² infrastructure and introducing 11 hectare precint.
5- Introduction of sewerage refinery for Khal Khal with original pipe line to refinery with the length of 5Km and building precinct and building lateral and official buildings.
6- Water transmission project of down level of Sangar, Foomanat part in Gilan.
7- Introduction of unplain crisscross project of Azadegan highway with Shahrzad and Eslam Shahr in Tehran.
8- Unplain crisscross project Taghebostan in Kermanshah.
9- Omission of Langan gorge ( introduction of a path in Ardabil with the length of 20Km )
10- Shiraz trainway project with the length of 2Km from Gole Sorkh square to Depo.Incleesive on earthly part , internal ramp to (u Wall) tunnel and introduction in (cut and cover) style.
11- The secand line subway project sentinel structure, the north crooked in Mashhad.
12- The project of sentinel structure, the A2 stop. Second line of subway.
13- Lightning system , irrigation of green space of kalantari Blvd .

1- Guardian structure project of babojavad station(Mashhad subway line3).
2- Guardian structure project of T3 station(Mashhad subway line3).
3- Production & export of guard rail to Turkmanistan (3000km lenght , 100 million dollar amount).
4- Introduction of 96-bed-Amol hospital with 17000 m² infrastructure and introducing 11 hectare precint.
5- Introduction of sewerage refinery for Khal Khal with original pipe line to refinery with the length of 5Km and building precinct and building lateral and official buildings.
6- Water transmission project of down level of Sangar, Foomanat part in Gilan.
7- Introduction of unplain crisscross project of Azadegan highway with Shahrzad and Eslam Shahr in Tehran.
8- Non-level intersection Taq-Bostan in Kermanshah .
9- The road to remove Langan defile ( introduction of a path in Ardabil with the length of 70Km )
10- Shiraz trainway project with the length of 2Km from Gole Sorkh square to Depo.Incleesive on earthly part , internal ramp to (u Wall) tunnel and introduction in (cut and cover) style.
11- The secand line subway project sentinel structure, the north crooked in Mashhad.
12- The project of sentinel structure, the A2 stop. Second line of subway.
13- Lightning system , irrigation of green space of kalantari Blvd .

14- Ferdowsi University of Mashhad with 35000 square meters of infrastructure

15- Completion and reinforcement of Esteghlal Hotel Tower located in Tehran

16- Water transfer system behind Gavoshan dam located in Kermanshah province.

17-Construction of bridges and non-level intersections located on Kurdistan Street in Tehran.

18- Construction of streets and landscaping of the Pezeshkan town in Mazandaran province with a total area of 150 hectares.